Sunday, 29 April 2018

Isro to check GSAT-11 power system redundancy, logic

The satellite, which was to be launched on May 25 from Kourou, French Guiana, by an Arianespace rocket, will be subjected to repeated thermal vacuum tests, among other things. Most tests to be conducted at the Isro Satellite Centre here are related to the power system.

from India News | Latest News Headlines & Live Updates from India - Times of India https://ift.tt/2vWkm6r

No comments:

Post a Comment